A clear, seven-step process from first visit to final handover — so you always know what’s happening, what’s next, and what it costs. No vague promises, no disappearing builders.
We start with a no-obligation consultation. We visit your home, measure the space, and talk through how you use the bathroom, what’s frustrating you about it, the look you’re after and a realistic budget. This is where good renovations are won or lost — getting the brief right before anyone picks up a tool.
We turn your brief into a clear design with a sensible layout, material and fixture selections, and a fixed written quote. You see exactly what you’re getting and what it costs before committing — no vague estimates, no nasty surprises halfway through. We’ll also flag anything that may need Auckland Council consent.
Once you’re happy, we order your tiles, tapware, vanity and fixtures and lock in a start date with a realistic build timeline. Ordering early is how we avoid the mid-build delays that come from waiting on back-ordered or imported items.
We protect your floors and access ways, then strip the bathroom back. Our registered plumber and electrician carry out the rough-in — relocating or upgrading pipes and wiring as the design requires — followed by any framing and substrate preparation.
The most important stage. We waterproof the wet areas to the New Zealand standard AS/NZS 3740, with the correct membranes, falls to the drain and careful detailing around the shower, niche and junctions. Done properly, this is what protects your home for decades.
Floor and wall tiling laid dead level, the vanity and cabinetry installed, then the fit-off — toilet, basin, shower, tapware, heated towel rail, mirror and accessories. This is where the bathroom finally comes together.
We complete a detailed finish, clean the space thoroughly, and walk you through your new bathroom. You get the paperwork you need — and our workmanship guarantee stands behind the job long after we’ve left.
We treat your home with respect — floors protected, site kept clean, and a clear point of contact throughout. You’ll get a realistic timeline up front and updates as we go. Most Auckland bathroom renovations take 2–4 weeks on site once the build begins, depending on size and scope.