Certified waterproofing to AS/NZS 3740 — the single most important step in any bathroom.
Waterproofing is the one part of a bathroom renovation you will never see, and the one part that can cost you the most if it is wrong. It is a hidden membrane applied before tiling, and it is the only thing standing between daily showers and the timber, framing and ceiling below.
We treat waterproofing as the critical step it is — applied to AS/NZS 3740, by people who do this for a living, and documented. If you take one thing from this page, let it be this: waterproofing is not where you save money on a bathroom. When you are ready, Get a Free Quote.
A bathroom gets wet in ways you might not expect. Not just the shower floor, but splashes up the walls, steam condensing on every surface, and water that finds its way behind the vanity or along the floor. Tile and grout do not stop that water — grout is porous and lets moisture through over time. The waterproof membrane underneath is what contains it and directs it safely to the floor waste.
A membrane is a liquid-applied or sheet system that forms a continuous, flexible, watertight skin over the floor and up the walls of wet areas. Done properly it bonds to the substrate, bridges the junctions where water loves to escape — floor-to-wall corners, around the waste, and up into the shower — and moves with the building without splitting.
Waterproofing of internal wet areas in New Zealand is governed by the standard AS/NZS 3740, which sits under the NZ Building Code's requirements for internal moisture (clause E3). It sets out which areas must be waterproofed, to what height, and how junctions and penetrations are treated. It is not a guideline you can take or leave — it is the benchmark a bathroom is judged against.
We waterproof to this standard as a matter of course, because it is both the law and simply how a bathroom should be built.
We get called to leaking bathrooms, and the story is nearly always the same. The waterproofing looked fine on the day. The failures are never on the surface — they are in the details that were skipped.
When waterproofing fails, the damage is slow and hidden: rot in the framing, swollen flooring, a stained or sagging ceiling in the room below, and sometimes a repair bill larger than the original renovation. By the time you see a mark on the ceiling, the problem has been developing behind the tiles for months.
Waterproofing is restricted building work when it is part of a bathroom that needs a building consent, and it should always be carried out by someone competent in the specific membrane system being used. This is not a job to hand to a willing DIYer or the cheapest available hand.
Our waterproofing is applied by people who do it properly, to the manufacturer's system and to AS/NZS 3740, and it is coordinated with the tiling and plumbing so the whole wet area works as one. It is central to any wet room installation or shower installation, where there is no hob to fall back on. Plumbing and drainage connections are completed by registered tradespeople, so the waste the membrane laps into is correct too. Getting the right people on this step is the single best insurance you can buy for a bathroom.
Where your renovation requires an Auckland Council building consent, waterproofing is one of the staged items that is documented and, in many cases, inspected before it is covered up. This paper trail protects you.
We photograph the completed membrane as part of our own quality control, so there is always a clear record of what went in behind your tiles.
Done well, waterproofing is invisible in the finished bathroom — but there are signs of a job done right before the tiles go on. A continuous, even-coloured membrane with no pinholes or thin patches. Reinforced, neatly formed corners and fillets. The membrane carried to the correct height up the shower walls and lapped cleanly into the floor waste. Penetrations sealed around every pipe. Falls formed in the screed so water runs to the waste, not into a corner.
Waterproofing is a part of every bathroom we build, and its cost is folded into the overall project rather than quoted as a stand-alone add-on. For a standard full bathroom renovation in the $20,000–$35,000 guide range, it is a modest line that protects the entire investment — you can see where it sits in the sequence on our process page. It is, quite simply, the part of the job the team at Bathroom Renovation Auckland is least willing to compromise on.
Get a free, no-obligation design consultation and a fixed written quote for your Auckland bathroom renovation.
Get My Free Quote